From: route@monster.com
Sent: Friday, April 08, 2016 12:11 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Wale Alabi 9902 Olive Brook Lane, Houston, TX 77095 Tel: 281.836.1513 walelabi@hotmail.com CAREER SUMMARY Senior
Project Services/Project Controls personnel, with experience supporting the
project team from project inception, to a timely project execution and
delivery. EXPERIENCE Senior Project Services personnel with over
15 years in the project execution, project controls, project
planning/scheduling, project cost engineering, risk management, time impact
analysis, trend analysis, and earned value management. Experience working
stage gate management processes with major Oil companies in all phases of
project, developing bid plans, detailed plans, and execution strategies. EDUCATION University of Alabama at Birmingham OAU
University, Nigeria MEng Construction & Engineering
Management – 2014BSc Chemical Engineering - 1996 Certification: Project Management
Professional (PMP) PMI
Scheduling Professional (PMI-SP)
PROJECT CONTRIBUTIONS Santos - Gladstone LNG, Gladstone Australia Lead Project Control Engineer/Lead Planning
EngineerSeptember-12 to Present ·
Supervise
and manage Quantity Surveyors ·
Managed
the development of the Construction, commissioning and shut-down schedules. ·
Conducted
planning meetings with contractor planners and field engineers to evaluate,
reforecast and re-sequence construction and commissioning activities to align
with current project objectives and targets. ·
Contract administration and management of subcontracts for
Provisional sums portion of overall contract ·
Guide senior surveyor in cost report preparation and progress measurement evaluation ·
Negotiate
and agree the Standard Work Process Procedure with the Contractor ·
Reviews
and determine Extension of Time claims as put forward by contractors ·
Guide
QS in the generation, update and maintenance of database used for monitoring
construction progress; prepares the weekly progress reports. ·
Analyzes
the weekly progress versus the planned target dates, generates forecast of
trending completion date and provide weekly reports on the impact on the
overall schedule ·
Maintains
the Progress Measurement System and prepares the weekly and monthly reports;
generates production S-curves, visual construction progress graphs, lost man
hours graphs, 4 week look ahead, weekly target and KPI charts. ·
Updated
the project trend analysis procedure. ·
Guide
my team in monitoring subcontractor’s personnel and equipment and prepares
“counter” monthly timesheets used for invoicing. ·
Examine,
control and evaluate subcontractors invoices and ensure that the contractual
obligations are satisfied and advice the Cost Control team on payments of the
same ·
Guide
my QS in the production of takeoffs, measures, and checks installed
quantities for progress measurement and variations and changes ·
Administers
Change Orders and maintains the change order register(s). ·
Track
and manage scope/work, schedule and material cost expended on reimbursable
package Works. ·
Assessing
Sub-Contract Variation and monthly progress claim. ·
Monitor,
analyze, review and report schedule impact. And use result to guide
construction crew. (Earned value metrics) Chevron (Swift) - Angola Liquefied Natural
Gas Lead Planning EngineerMay-2010 – September-2012 ·
Work
with the existing offsite planners to develop an overall coding structure for
all offsite projects that enhanced better and more efficient project
reporting/updating system. ·
Conducted
planning meetings with the contractor and contractor’s planners and field
engineers to reforecast and re-sequence planned construction work to re-align
with current project objectives. ·
Created
earned value spreadsheets to tract contractor physical progress. ·
Developed
leading indicator progress curves, that highlights critical project
activities and recommending mitigation plans to forestall/reduce schedule
slippages. ·
Reviewed
and analyzed contractor schedules for quality as it adheres to planning
standards, critiquing contractor schedules, offering corrective suggestions
and integrating contractor schedule with client planning activities. ·
Issue
weekly schedule updates as required. Chevron (Swift
Technical Services) – Escravos Gas Project, Nigeria
Senior Project Controls Engineer May 2009 – April
2010 ·
Preparation
and maintenance of level 3 Pre-commissioning and commissioning schedules as
fully resourced networks, including the leveling of work within agreed
priorities, resource levels and targets. ·
Review
and co-ordination of all level 4 data input. (Resources, Job Cards) ·
Preparation
of weekly and monthly planning / progress reports for various levels of
managements needs. ·
Production
of ``what if`` scenarios and plans to suit both client requirements. ·
Performed
quantitative schedule risk analysis using PertMaster 8.5 to determine the
project deterministic finish dates and foster the challenges on the project’s
success – Monte Carlo schedule simulation. ·
Participated
in risk review sessions/workshops to identify risks/opportunities, and
perform monthly monitoring and controlling tasks using earned value
management methodology. ·
Mentoring
and development of Nigerian planning personnel, to raise their competence,
awareness, knowledge and techniques required in the execution of planning
functions. ·
Built,
maintained and issue daily reports on the Turnaround schedule for Train 1
during the 30 days shutdown window. Turner & Townsend (For BP Alternative
Energy Wind Projects) – Houston, Texas Senior Consultant
August 2008 – May 2009 · Developed relevant documents to support project
advancement through the various MPcp stage gates. ·
Production
of ``what if`` Schedule scenarios and plans for use by the Project Manager ·
Build
recovery schedules on various wind projects that are under severe schedule
slippages. ·
Developed
leading indicator progress curves for critical project activities. ·
Issuing
weekly & monthly planning progress reports ·
Develop
and maintain multiple wind energy project schedules during key stages
starting from the Appraise stages. ·
Maintain
the overall master project schedules in Primavera Project Planner (P3/P6). ·
Projects
range between 69 wind turbines to 268 turbines with capacities up to 600MW.
Some the projects include Fowler III Wind Farm Project (Indiana), Sherbino
Mesa II (Texas), Flat Ridge Wind Farm (Kansas) ·
Make
frequent field trips to gather planning and updating information. Technip USA - Angostura Gas Project (BHP
Billiton – Trinidad & Tobago) Lead Project Planner/Scheduler January 2008 –
August 2008 ·
Preparation
and maintenance of level 3 logic driven and resource loaded project
schedules, including the leveling of work within agreed priorities, resource
levels and targets. ·
Worked
with overseas counterparts to gather information and setup Tehcnip USA standard
progress system using their proprietary progress management system (Janus). ·
Liaise
with the engineering / construction groups with respect to setting up the
departments rules of credits during progress reporting. ·
Preparation
of weekly schedule update reports as well as weekly and monthly earned value
reports using Technip’s proprietary progress reporting system. ·
Attend
regular planning and scheduling meetings, where schedule issues were
discussed and corrective actions are suggested. ·
Preparation
of 2 weeks, 4 weeks & 60day look-ahead schedules. ·
The
AGP includes modifications made to the existing Angostura facilities and the
installation of new flow lines. Cameron International (Subsea Systems) –
Houston, Texas Master Scheduler November 2006 – January 2008 · Liaise with the commercial /
business support group during project conception to build the proposal
schedules. Negotiate and agree with contractor on the Standard of Work
Process Procedure. · Production and maintenance of
level 3 logic driven project schedules for assigned projects. · Review and co-ordination of
various data inputs gathered from SAP for schedule integration (Material
tracking and reporting), using SAP BW system. · Develop improvements in planning
standards, procedures, processes, and systems by producing standard WBS and
coding structure to ensure uniform project reporting. · Implement planning schedule
actions arising from the impact of variations as direct impact of the change
orders. · Maintain the planning element of
the change control procedure. · Issue the overall schedule weekly
reports, including the earned value reports and the S-Curves. · Identify common schedule pitfalls,
track project status and providing corrective recommendations based on
results of data analysis. · Projects include the fabrication,
installation, and testing of various subsea systems including
Cameron christmas trees, umbilical’s, subsea instrumentation systems,
control systems, connections, manifolds, tubing hangers and tooling,
and flow line connection equipment. S&B Engineers and Constructors –
Houston, Texas Senior
Project Planner June
2005 – November 2006 ·
Developed,
managed and report on assigned project schedules. Granite
Services (GE Energy Services) – Tampa, Florida Project
Controls Engineer February 2004 – May 2005 ·
Developed
and Managed fully resourced assigned power plant turnaround schedules ·
Provide
overall schedule analysis and reports as required by management (critical
paths, look ahead, etc) Ariosh Engineering (Mobil Nigeria
Unlimited), Lagos Nigeria Project Planner/SchedulerJanuary 2001 – February 2004 ·
Managed
and report on overall subsea systems project schedule for the Utue PP II
project. COMPUTER
LITERACY Primavera
Project Planner (Sure Track, P3/P6 vs 8.2), MS Office, MS Project, SAP.
Oracle Primavera Risk Analysis (Permaster), Auto Desk Revit, & Smart
Plant Review. Citizenship - USA 1
Wale Alabi |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|